• All
  • Mobile
  • Photography
  • Webdesign
  • Default
  • Title
  • Date
  • Random
  • Western Distributor - Seymour Whyte

  • Cox River Road- Ertech

  • M4 - Seymour Whyte

  • Narellan Road Stage 2B - Seymour Whyte

  • Nepean Bridge - Seymour Whyte

  • Sydney Light Rail - Acciona

  • Hurlstone Park - Downer

  • M12 Project Fauna Fencing- Seymour Whyte

  • Coffs Harbour Bypass - Ferrovial Gamuda JV
  • Labour Hire and Plant Hire

  • M4 - Seymour Whyte

  • Sydney Airport - AG Security Group

Western Distributor

Client - Seymoure Whyte Construction

Scope - Cable tray installation and sign installation

Contract Value - 3M plus 

About - 

The Western Distributor Smart Motorway project installed smart technology and digital signage on the Western Distributor between Anzac Bridge and the Sydney Harbour Bridge, to improve traffic flow, travel time and safety for road users. Around 130,000 vehicles use the Western Distributor each day, making it Sydney’s busiest transport corridor.

Installation of the gantries involves the closure of the Western Distributor with traffic and buses detoured to enable the large cranes to set up and install gantries overnight and reopen the road to users for the busy morning peak. To connect these 21 gantries, electric cables and roadside cabinets were installed in the surrounding streets and roads through a network of above ground cable trays, and underground pits and conduits.

Georgiou - Mona Vale Road Upgrade

Client: Georgiou 

Value: $600,000

Location: Mona Vale 

Commence: June 2019

Project Description: The project involves upgrade and widening 3.2km of Mona Vale Road between Manor Road, Ingleside and Foley St, Mona Vale, in the Northern Beaches of Sydney

Scope of Works: SDC Civil has been contracted to complete the following works

  • Supply and install Fauna Fence
  • Supply and install Monowills
  • Supply and install Pedestrian fencing

Acciona - Sydney Light Rail

 

Client : Acciona 

 

Contract Value: $3.0M plus

 

Location: Randwick and Sydney City

 

Commence: August 2017

 

Project Description: The CBD and South East Light Rail is a new light rail network for Sydney, currently under construction. The 12km route, featuring 19 stops, will extend from Circular Quay along George Street to Central Station, through Surry Hills to Moore Park, then to Randwick and Kingsford via Alison Road and Anzac Parade.

 

SDC Civil Scope of Works:

 

SDC Civil were contracted by ACCIONA to complete the following works:

 

  • Zone 7 (Park Street to Bathurst Street) installation of CSR route, CSR pits, low voltage, non-potable pipe, hydrants install, stop valves, CSR drainage and earthing and bonding for the entire zone.
  • Demolition and reconstruction of Market Street Intersection and Park Street Intersection. This was completed over a number of staged weekends to enable the intersection to be fully operation by Monday morning. 
  • Installation of Heritage Pavement works at Randwick Race Course
  • Construction of Full depth pavement on Wansey Road and Randwick Race Course
  • Placement of correctional course of Asphalt at Wansey Road
  • Construction of MSB footings
  • Demolition and reconstruction of kerb, gutter and footpaths to new levels at numerous locations
  • Installation of Stormwater pits, pipes and link ups within the CBD and Randwick suburbs
  • Construction of a new road entry at University of New South Wales Gate 9. This included relocation of services, earthworks, placement of base course, kerb and gutter works, footpath construction and full depth pavement.
  • Installation of Non-potable water – Includes excavation, installation of pipe, welding PE pipe, installation of hydrants and stop valves and backfill works
  • Installation of Low Voltage Works – Includes excavation, installation conduits, installation of pre-cast pits and backfill.

 

 

 

 

Seymour Whyte - Narellan Road Stage 2B

 

 

Client : Seymour Whyte (60Million)

 

Value : $1.5M

 

Location : Narellan Road Stage 2B

 

Commence : June 2016

 

Project Description : Western Sydney's Narellan Road between Camden Valley Way at Narellan and Blaxland Road at Campbelltown was upgraded to a six-lane divided road to improve traffic flow and road safety in the corridor. Approximately 7 kilometres of Narellan Road was upgraded and widened. 

 

SDC Civil Scope of works

  • Labour hire
  • Installation of Pedestrian fencing
  • Installation of guard rail 
  • Installation of safety bollards
  • Installation of kerb and gutter
  • Installation of footpaths, shared paths and pram ramps
  • Installation of bridge girders
  • Installation of chain wire fencing

 

Seymour Whyte - Nepean Bridge

Client: Seymour Whyte

Value of Contract: $450,000

Location: Nepean Bridge 

Commence: October 2017

Scope of works: 

  • Installation of stormwater drainage - Includes FRP insitu drainage pits
  • Backfilling of retaining walls and installation of vertical drains
  • Removing sheet piles
  • Labour hire and plant hire
  • Construction of shared path
  • Subgrade and subbase preparation
  • Installation of rural fencing

 

 

Contact Form

Please, enter your name
Please, enter your phone number
Please, enter your e-mail address Mail address is not not valid
Please, enter your message

Links

Latest News

SDC Civil - Licence Builder 

Contractors Licence Number: 384421C

Address

AU Company
Sydney NSW 2000
jeff@sdccivil.com.au
Mo-Fr: 10.00 - 18.00